Login
Please enter your access details.
Services
318 | 733
Services
Effects of various engineering works on train arrivals and starting times for pick-up
04/18/2016

Please note that the high number of engineering works on the track infrastructure may result in delays in the running times of our trains over the next few weeks. The following routes are affected:

  • Complete closure of the Hanover – Kassel high-speed rail line (trains diverted via various parallel lines)
  • Munich – Rosenheim – Salzburg/Kufstein (– Brenner)
  • Engineering works on Tauern line (Austria)

The later arrival times may have an impact on the starting times for pick-up. We are currently examining the information provided by the network operators and train operating companies to determine which trains will be affected by delays in the starting times for pick-up.

As soon as we have detailed information, this will be shown on our website www.kombiverkehr.de and communicated in the usual way for each train by our colleagues in Transport Monitoring. Please note the above when drawing up your schedules. Thank you for your patience.